Quick answer: in Victoria the council decides whether a planning permit application is advertised. When it is, the owners and occupiers of adjoining land get notice by letter, usually with a sign on the site, for at least 14 days. Some councils post the letters for a fee; others ask you to do it. Separately, building work that could damage the property next door needs a protection work notice, and the neighbour has 14 days to reply.

Planning permits: section 52 notice

Who decidesThe responsible authority (usually council) gives notice or tells you to give it. If it has not set requirements within 10 business days, you can give notice yourself
Who is toldOwners and occupiers of adjoining land unless council is satisfied there is no material detriment, plus anyone else who may be harmed, other affected councils and people named in the planning scheme
HowA sign on the land, a newspaper notice, letters delivered by hand or post, or any other method council thinks fit
How longThe councils we checked all use at least 14 days

Planning schemes exempt some applications from notice, and VicSmart applications are not advertised.

Source: Planning and Environment Act 1987, section 52. Checked 7 October 2026.

Protection work notices

If your building work could damage the property next door, for example excavating near its footings, the owner must serve a protection work notice on the adjoining owner.

  • The neighbour has 14 days to respond. No reply counts as agreement.
  • The relevant building surveyor decides whether protection work is needed and tells both owners in writing.
  • Either side can appeal to the Building Appeals Board within 14 days of that decision.
  • The owner must insure the adjoining property until 12 months after completion and pay the neighbour’s reasonable costs, such as an engineer’s review.

Source: Protecting adjoining properties, Building and Plumbing Commission. Checked 7 October 2026.

Beyond the people next door

The statutory notice only reaches adjoining land. The street will still hear the concrete trucks. A short courtesy letter to everyone within 50 to 100 m, a week before work starts, heads off most complaints. Our construction notice template is a good start.

Council by council

What each council publishes about advertising a planning application. Follow the source link for current fees and forms.

Merri-bek City Council

Who sends lettersCouncil posts notices to adjoining owners and occupiers for you and supplies the site sign. You put the sign up and place any newspaper notice
Who gets oneAdjoining owners and occupiers by post, plus the public through the site sign
Notice periodAt least 14 clear days from the day the sign goes up

The sign goes at eye level within one metre of the frontage, fixed to a board, with the date in waterproof pen. After 14 days you complete a statutory declaration before a JP and return it with the fee.

Source: A guide for planning applicants (January 2024). Checked 7 October 2026.

City of Whittlesea

Who sends lettersCouncil, for a fee. You place the sign Council provides
Who gets oneAdjoining owners and occupiers and any other affected properties
Notice periodAt least 14 full days

Fees listed: $256.80 for the site notice and $16.35 per letter. You sign a statutory declaration that the sign was up for the full period.

Source: Planning permit application process. Checked 7 October 2026.

City of Boroondara

Who sends lettersYou, when Council asks you to give notice
Who gets oneNeighbours and others affected by the proposal
Notice periodAt least 14 days

VicSmart and subdivision applications are not advertised.

Source: Apply for a Planning Permit. Checked 7 October 2026.

Wyndham City Council

Who sends lettersCouncil advertises the application
Who gets oneSurrounding owners and occupiers and other interested parties
Notice periodAt least 14 days, 28 days over Christmas

Source: Online Planning Register and Applications on Advertising. Checked 7 October 2026.

Hume City Council

Who sends lettersCouncil
Who gets oneAdjoining owners and occupiers, and sometimes the wider area through the local paper
Notice periodAt least 14 days

An extra fee covers the advertising.

Source: Planning Permit Frequently Asked Questions. Checked 7 October 2026.

Glen Eira City Council

Who sends lettersCouncil
Who gets oneNeighbours by letter, plus a sign on the site
Notice periodAt least 14 days

Source: Permit process and timeframes. Checked 7 October 2026.

City of Stonnington

Who sends lettersCouncil
Who gets oneProperties that may be affected, by letter or a sign on the property
Notice period14 days, inside the 60 day decision period

Source: How we assess planning applications. Checked 7 October 2026.

City of Casey

Who sends lettersCouncil decides which applications are advertised
Who gets oneAffected properties and nearby residents, by mail
Notice periodAt least 14 days

Advertising can also include signs on the site and a notice in the local paper.

Source: Advertising of your planning application. Checked 7 October 2026.